RPA is a member of the team of Architectural and Enginering
Design Support Services for the Hartsfield-Jackson Development
Program. This team is responsible for mechanical, electrical,
plumbing and fire protection engineering services.
Current projects include developing the Design Criteria Package
for design/build contract. This involves describing the programmatic
criteria and conceptual configuration for the proposed facility,
including roadway connections and arrangements for inbound and outbound
vehicular travel, a 8-level parking deck, an elevated pedestrian walkway
between the parking deck and the Gateway APM Station, and modifications
to the Gateway APM Station.
RPA is responsible for the electrical engineering and fire alarm
design services for the Department of Aviation's New Airport
Safety/Centralized Command and Control Center. RPA will also design
the Fire Administration Offices and Training Facility, which will be
housed in the remainder of the space.
RPA has also provided services to evaluate and design a licensed and
non-licensed vehicle road tunnel to pass under the new taxiways "W"
and "Z" that serve the new 5th runway at Hartsfield-Jackson Int'l
Airport.