Coca Cola Space Concourse "C" First Union Center Regulator Station

 

Coca-Cola Retail Space located at Hartsfield International Airport

 

Description of work:

RPA was responsible for the design of electrical, mechanical and communication facilities for the Coca Cola retail spaces at Hartsfield International Airport. The scope of work included design of data, telephone and fire alarm facilities, power and lighting circuits, illumination levels and all mechanical facilities.

Photographs of Coca-Cola Retail Space:

Coca Cola Retail Space pic 1

Coca Cola Retail Space pic 2

Coca Cola Retail Space pic 3

 

 

back to work performed

to top of page


Concourse "C" Hartsfield International Airport

 

Description of work:

RPA was responsible for the design of electrical, mechanical and communication facilities for the Hartsfield International Airport in preparation for the 1996 Olympics. RPA was responsible for the design of new and revised mechanical and electrical facilities in the main terminal and concourse "C". The scope of work included design of power and lighting circuits, data, telephone and fire alarm facilities, illumination levels and all mechanical facilities.

Photographs of Concourse "C".

Concourse "C" pic 1

Concourse "C" pic 2

 

 

back to work performed

to top of page


First Union Banking Center Hartsfield International Airport

 

Description of work:

RPA was responsible for the design of electrical, mechanical and communication facilities for the First Union Bank/Capital Cities Bank and the First Union ATM's at Hartsfield International Airport. The scope of work included design of data, telephone and fire alarm facilities, power and lighting circuits, illumination levels and all mechanical facilities.

Photograph of Banking Center:

First Union Banking Center pic

 

 

back to work performed

to top of page


Pipeline to Pressure Regulator Station

 

Description of work:

RPA was responsible for designing the Natural Gas Facilities for Georgia Power's Yates and Arkwright Power Plants. The scope of work included the design of the Pipeline Regulator station at the pipeline supply.This included the design of the Pipeline Filter, the Pipeline Heater, the Gas Odorizer and the Corrosion Control Facilities. RPA also functioned as technical advisor for the design of the 8-mile, 20-inch diameter 800-psig MAOP transmission system at Plant Yates and the 3-mile, 24-inch diameter, 800-psig MAOP transmission system at Plant Arkwright.

Photographs of Natural Gas Facilities:

Pipeline Heater

Pipeline Filter

Pipeline Regulator

 

 

back to work performed

to top of page